bacnet building controller

tag class

Template Information
Key details and background about this template.
Is Abstract
No
Description
A Building Automation and Control Network controller
Synonyms
  • ENOWA Tag Code
    BBC
Graph View
Properties
Data required for this equipment.
Required
  • Source: Core
  • Data Type: Text
  • Max Length:
  • Source: Core
  • Data Type: AssetType
  • Max Length: 30
  • Source: Core
  • Data Type: AssetType
  • Max Length: 100
Required
  • Source: tag class
  • Data Type: Text
  • Max Length: 10
  • Picklist:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length: 100
  • Picklist:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Picklist:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Source: tag class
  • Data Type: Text
  • Max Length: 10
  • Source: tag class
  • Data Type: Text
  • Max Length: 10
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Picklist:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Source: tag class
  • Data Type: Text
  • Max Length: 10
Required
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Picklist:
  • Source: tag class
  • Data Type: Text
  • Max Length:
Required
  • Source: tag class
  • Data Type: AssetLink
  • Max Length:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length: 40
Required
  • Source: tag class
  • Data Type: Text
  • Max Length: 100
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Source: tag class
  • Data Type: Boolean
  • Max Length:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Picklist:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Source: tag class
  • Data Type: Boolean
  • Max Length:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length: 40
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Source: tag class
  • Data Type: Text
  • Max Length:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Source: tag class
  • Data Type: Text
  • Max Length:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length: 40
Required
  • Source: tag class
  • Data Type: Text
  • Max Length:
  • Picklist:
Required
  • Source: tag class
  • Data Type: Text
  • Max Length:
Document Types
Document types required for this equipment.

A document certifying that an instrument shall deliver an accurate output within a set operating range.

A diagram showing details of cable numbers and terminations point to point (e.g., to/from vendor packages, equipment).

A datasheet which provides precise information about a tag and compliments equipment specification.

A specification that describes the physical equipment for the purpose of procurement or fabrication. Compliments the datasheet.

A procedure indicate size of container, number off, weight, identification and contents, include detail preservation procedure detailing inspection periods, materials required etc., both prior to installation and post installation, but prior to commissioning. Any special unpacking/handling requirements shall be stated.

A report documenting method and results of heat treatment. Typically includes pyrometric charts or certificates confirming the heat treatment cycles have been conducted to 'purchasers' requirements.

A diagram which may show the instrument impulse, pneumatic and electronic connections, pipe work, valves, fittings, flanges and support details with associated material take-off list. Used for removal/hook up purposes and modifications.

A document capturing what particular activities and requirements will be executed and delivered relating to inspection and testing for construction & vendor work.

A report documenting status and observations relating to an asset/object. Can include paint, insulation, noise, thickness measurement, destructive weld testing, NDE, preservation, cathodic protection tests, etc. Excludes pressure tests.

A document that describes methods of installing a piece of equipment. Installation refers to the mounting, setting, erection, etc.

A diagram showing the precise location of assets/objects at a plant, process unit, or area basis relative to surrounding structures and equipment.

Required

A diagram showing details all elements of a control loop, from sensing element through to controlling element, and cabling and wiring details for the associated instruments. Includes junction box, marshalling cabinet and control panel terminations and power supply details.

A document that describes methods of maintaining a specific piece of equipment. Typically originates from the equipment or package supplier.

A procedure detailing all non-destructive tests/examinations. Excludes pressure tests.

A document that describes methods of operating a piece of equipment or process unit, including but not limited to Instructions, procedures, drawings, tables, etc. for the operation -stop, start, and emergency shutdown. Including operational limits, function testing, possible interruptions, corrective actions, hazards and corrective measures to be taken.

Required

A request with a brief description of the parts to be ordered, with a statement of the pertinent drawings, specifications, etc., as well as a list of drawings and documents to be provided by the manufacturer/supplier.

This document shall verify the level of the safety integrity level (SIL) and shall include necessary performance data according to authority regulations.

A pictorial representation of the main elements and functions of a control circuit for electrical equipment with input/output sources (switches, relays etc.) and their relationships. Details logic functions of the circuit.

A list of recommended listing of spares received from vendor/manufacturer to support installation, commissioning, operation or maintenance.

A time-based document outlining order in which tasks are to be carried out and the amounts of time allocated to them to achieve inspection and testing scope.

Related Templates
Templates linked to this one.

A Building Automation and Control Network controller