| API Standard 682 data sheet attached | Specify if an API Standard 682 mechanical seal data sheet is required for the proposed pump | Text |
| ECMS simulation test requirement | Specify if an integrated internal arc-fault detection system is required | Text |
| HV connection compartment space heater requirement | Specify if a space heater is required in the high voltage compartment | Text |
| IED remote configuration via ECMS | Specify if the IED remote configuration via ECMS requirements | Text |
| LV auxiliary compartment space heater requirement | Specify if a space heater is required in the low voltage auxiliary compartment | Text |
| OH3 back-pullout lifting device required | Specify if device for back-pullout and lifting of a OH3 type pump is required | Text |
| accelerometers requirement | Specify if accelerometers are required | Text |
| additional central flush port | Specify if an additional, centrally located, flush port on the top of the mechanical seal gland plate is required | Text |
| additional surface/sub-surface examination | Specify if any additional surface/sub-surface examination is required | Text |
| adjustable speed drive | Specify if adjustable speed drive is required | Text |
| adjustable speed drive operation curve requirements | Specify if adjustable speed drive (ASD) operation curve is required | Text |
| circuit breaker condition monitoring | Specify if an integrated circuit breaker condition monitoring system is required | Text |
| component balance to ISO 21940-11, Grade G10 | Specify whether the proposed pump rotating components are required to be dynamically balanced to ISO 21940-11, Grade G10 | Text |
| coupling with hydraulic fit | Specify if the coupling hubs are required to be fitted hydraulically | Text |
| coupling with proprietary clamping device | Specify if the coupling hubs is required be fitted with a proprietary clamping device | Text |
| data for protection setting/power modelling requirements | Specify data for protection setting/power modelling requirements | Text |
| design approval prior to fabrication | Specify if design approval prior to fabrication is required for the proposed equipment or part of equipment | Text |
| differential protection | Requirement for pre-installed differential protection current transformers to be provided by the supplier | Text |
| drip cover requirement | Specify if drip cover is required | Text |
| drive-end bearing insulation | Specify if Drive-end bearing insulation is required | Text |
| earth fault front of compartment reset | Specify if a earth fault front of compartment reset is required | Text |
| facility to remotely test withdrawn functional units | Specify if facility to remotely test withdrawn functional units are required | Text |
| fine balancing above rated speed requirements | Specify if fine balancing above rated speed is required | Text |
| flat surface provision for mounting accelerometers only | Specify if only flat surfaces for mounting portable magnetic type accelerometers are required | Text |
| flat surface provision for mounting vibration probes only | Specify if only flat surface provision for mounting portable magnetic type vibration proximity probes are required | Text |
| gear requirement | Specify if a gear is required | Text |
| hardened sleeves under line shaft bearings | Specify if hardened sleeves under line shaft bearings are required | Text |
| hardness testing of parts, welds and heat-affected zones | Specify is hardness testing of parts, welds and heat-affected zones is required | Text |
| heating jacket required | Specify if a heating jacket is required | Text |
| ignition hazard assessment | Specify if ignition hazard assessment is required | Text |
| instantaneous start up requirement | Specify whether instantaneous start-up is required | Text |
| integrated internal arc-fault detection system | Specify if an integrated internal arc fault detection system in accordance with IEC TS 63107 is required | Text |
| junction box required | Specify if a separate junction box is required for the equipment | Text |
| lifting device requirement | Specify if a lifting device, typically a wheeled hoist to facilitate the removal of functional units and associated components with a mass greater than 25 kg is to be provided by the supplier | Text |
| lubrication information plate | Specify if a dedicated information plate is to be attached to the motor, stating: bearing type, re-greasing amount, re-greasing intervals and grease product code | Text |
| machined and studded connections | Specify whether machined and studded connections are required for the proposed pump casing | Text |
| main circuit earth-neutral link within incoming circuit units requirement | Specify if main circuit earth-neutral link within incoming circuit units is required | Text |
| mimic (synoptic) diagrams requirement | Specify if a mimic one-line (synoptic) diagram is to be provided on the front of the PSC-assembly, displaying the single line arrangement of busbars and the main circuit switching devices | Text |
| motor condition monitoring | The requirement for a motor monitoring device mounted to the motor | Text |
| motor nameplate 'Oil Mist Lubricated' | Specify if 'Oil Mist Lubricate' nameplate is required | Text |
| motor surge protection | Specify if motor surge protection is required | Text |
| motor temporary tag 'Oil mist ready, do not run without oil' | Specify if temporary tag identifying 'Oil mist ready, do not run without oil' is required for the motor | Text |
| non reverse ratchet | Specify if non reverse ratchet is required | Text |
| non-drive end bearing requirement | Specify if the NDE bearing type to be used for ASD fed motor applications to prevent circulating common mode current is required | Text |
| on-line winding partial discharge measurement | Specify whether on-line winding partial discharge measurement is required | Text |
| one-event-per-revolution probe (key phasor) | Specify if a one-event-per-revolution probe (key phasor) is required | Text |
| oversized junction box | Specify if an oversized junction box is required | Text |
| portable insulation fault locator requirement | Specify if a portable insulation fault locator is required for PSC-assemblies with unearthed electrical supplies (IT) | Text |
| provision for internet of things hardware installation | The requirement for Internet of Things (IoT) hardware mounting points | Text |
| provision for mounting temperature probes only | Specify if only provision for mounting temperature probes is required | Text |
| provision of metal oxide surge arresters | Specify if metal oxide surge arresters to according to IEC 60099-4 is required | Text |
| pulsating torque requirement | Specify if the driven load has pulsation load characteristics is required | Text |
| pump baseplate sized to accommodate seal piping systems | Specify if the proposed pump baseplate is required to be sized to accommodate seal piping systems | Text |
| reduced-hardness materials | Specify if reduced-hardness materials are required | Text |
| repair and heat treatment records | Specify whether the vendor is required to keep repair and heat treatment records | Text |
| review and acceptance of thrust bearing size | Specify if the trust bearing size for the proposed pump is required to be reviewed and accepted Applicable to API pump types BB1, BB2 and BB3 | Text |
| rolling element bearing life calculations | Specify if the rolling element bearing life calculations are required for the bearing arrangement | Text |
| sealed for life anti-friction bearing requirements | Specify if sealed for life anti-friction bearings are required Normally only for smaller motors | Text |
| security certification for industrial automation and control system components | Specify if security certification for industrial automation and control system components are required | Text |
| shaft flexibility index reported by vendor | Specify if the shaft flexibility index (SFI) is to be reported by vendor | Text |
| shrink fit limited movement impellers | Specify if shrink fit limited movement impellers are required | Text |
| space heater requirement | Specify if a space heaters is required | Text |
| special coating requirement for impellers and other wetted parts | Specify if special coating for impellers and other wetted parts are required | Text |
| stainless steel fixing requirement | Environmental factors that require stainless steel nuts, bolts, washers and any other fixings are to be manufactured from stainless steel | Text |
| stainless steel hardware required | Specify if stainless steel hardware is required due to environmental conditions | Text |
| stainless steel plate, thickness 02 in (5 mm) minimum, under all pump feet | Specify if stainless steel plates, thickness 02 in (5 mm) minimum, under all pump feet are required for the proposed pump | Text |
| supplementary conductor marking by colour | Specify if identification of the conductors of main and auxiliary circuits is required | Text |
| temperature detector surge arrestors requirement | Specify if temperature detector surge arrestors are required | Text |
| temperature gauges requirements | Specify if temperature gauges are required | Text |
| temperature probe requirement | Specify if temperature probes are required | Text |
| thermal condition monitoring | Specify if an integrated thermal monitoring system is required | Text |
| threaded provision for mounting accelerometers only | Specify if only threaded provision for mounting accelerometers is required | Text |
| threaded provision for mounting vibration probe only | Specify if only threaded provision for mounting vibration proximity probes is required | Text |
| vertical motor compliance to API 610, 71 | Specify if the vertical motor is required to comply with API 610, 71 | Text |
| vibration probes requirement | Specify if vibration proximity probes are required | Text |
| warning label requirement | Specify if warning label is required | Text |