CFIHOS-70000278
An authoritative collection of values with a relationship to piping. The columns of this collection are specified and controlled.
CFIHOS-70000403
A specialized functional design specification for piping.
CFIHOS-70000450
A report verifying that process safety hazards have been addressed prior to start-up.
CFIHOS-70000283
A report summarizing technical or commercial evaluation of a pre-qualification to tender.
CFIHOS-70000284
A request for information from a third party who may provide services or supply materials in order to identify if they meet required criteria.
CFIHOS-70000286
A procedure documenting specific steps to conduct inspection of an asset/object. Typically details boundaries of the test, isolations, method of pressurization, required hold intervals etc. Includes hydrostatic, pneumatic, vacuum and leak test/examinations.
CFIHOS-70000287
A report recording duration and results of hydro static, pneumatic, and leak test examinations. Typically includes a pressure chart to demonstrate satisfactory results.
CFIHOS-70000379
A diagram depicting primary steel(e.g., bracing, beams).
CFIHOS-70000289
A document describing the process control functionality (e.g. level control).
CFIHOS-70000290
A document detailing evaluation of operating scenarios and control schemas in order to optimize the facility design and control.
CFIHOS-70000293
A diagram detailing major items of equipment, primary lines and valves, operating temperatures, pressures and mass flows. Diagrams shall be provided for all hydrocarbon and utilities systems. Includes 'utility flow schemes/diagrams' [UFS/UFD].
CFIHOS-70000295
A diagram detailing safeguarding elements for process and utility protection against uncontrolled loss of containment.
CFIHOS-70000298
A time-based document outlining sequence and duration of activities related to procurement activities (RFQs, purchase orders, required on site milestones, etc.).
CFIHOS-70000299
A document outlining purpose and approach for developing contracting and procurement strategies is to identify the in-house scope and the contract packages that will eventually be placed in the market. The development of contracting & procurement strategies is the first step towards aligning the project demands of external parties (in terms of the required goods and services), with the market supply, in terms of capable and experienced contractors and suppliers.
CFIHOS-70000300
A report documenting progress made against a previously communicated plan or schedule. 'progress reports' can address time, scope, money, etc.
CFIHOS-70000302
A document capturing key project control execution plans applicable across the project scope.
CFIHOS-70000405
A specification describing scope and objectives of the project and its execution; details to be provided by 'owner operator'.
CFIHOS-70000303
A list of content types to be delivered by the project.
CFIHOS-70000404
A document capturing key discipline execution plans applicable across the project scope (e.g., IM Plan, Execution Plan).
CFIHOS-70000305
A time-based document summarizing all discipline related activities outlining sequence and duration.
CFIHOS-70000406
An order that describes the scope, price and delivery conditions of an item that is bought.
CFIHOS-70000451
A document describing procedures to ensure quality delivery of services or procured item(s) in conformance with the agreed requirements.
CFIHOS-70000309
A document capturing what particular activities and requirements will be executed and delivered to support recruitment. Typically the plan is built upon a strategy.
CFIHOS-70000079
A document certifying conformity to local regulations which accompanies shipment of equipment and/or goods. e.g., official certificate issued by OEM/supplier or approved licensed agent of OEM/supplier.
CFIHOS-70000112
Report demonstrating compliance with local regulations and law.