Document Types

Document types used in this project.

  • incident report

    CFIHOS-70000176

    A report issued to achieve timely notification report of any accident incident occurring during the projects, including on-site, in contractors offices, etc. Severity requirements to be specified by 'owner/operator'.

  • independent assessment

    CFIHOS-70000177

    An assessment which is generated by 3rd party technical or execution expert on work done in their relevant field to assess correctness of approach/deliverable.

  • index of documents

    CFIHOS-70000178

    Books, as defined in the CFIHOS require this Index to be created. Since the purpose of the 'index' is management of a group of documents, this can only be associated with JA 'information management'. Examples: 'health', 'safety', 'environment', 'quality communication dossier basic design', 'engineering package authority approval package'.

  • Specification of the Information types required by the owner for delivery and handover.

  • input, output list

    CFIHOS-70000179

    An authoritative collection of values with a relationship to a specific equipment. List to show input and output of an equipment (e.g. instrument, telecom equipment) connected to other equipment (e.g. distributed control system, programmable logic controller).The columns of this collection is specified and controlled.

  • A document capturing what particular activities and requirements will be executed and delivered relating to inspection and testing for construction & vendor work.

  • A document confirming completion or waiver of final equipment inspection by the purchaser or purchaser representative.

  • inspection report

    CFIHOS-70000245

    A report documenting status and observations relating to an asset/object. Can include paint, insulation, noise, thickness measurement, destructive weld testing, NDE, preservation, cathodic protection tests, etc. Excludes pressure tests.

  • installation analysis

    CFIHOS-70000425

    A report documenting assumptions and method determining acceptable loading conditions prior to operation, including but not limited to load out, transport, and installation for handling and assembly. Intended to support handling/installation guidance to project team(s).

  • installation diagram

    CFIHOS-70000119

    Installation refers to the mounting, setting, erection, etc. of equipment and accessories. These diagrams are for transient activity during installation (eg. sequence of activity) and not finished work.

  • installation manual

    CFIHOS-70000181

    A document that describes methods of installing a piece of equipment. Installation refers to the mounting, setting, erection, etc.

  • instrument list

    CFIHOS-70000418

    An authoritative collection of values with a relationship to instrumentation. The columns of this collection is specified and controlled.

  • insulation diagram

    CFIHOS-70000411

    A diagram detailing insulation, including anchoring and expansion joints, etc. Includes refractory.

  • interface agreement

    CFIHOS-70000443

    A document describing details of an interface between contract scopes including responsibilities, execution, deliverables, and actions.

  • interface diagram

    CFIHOS-70000186

    A diagrams documenting Interfaces and demarcation of responsibilities between different organizations (e.g. battery limits, terminations).

  • interface plan

    CFIHOS-70000188

    A document capturing what particular activities and requirements will be executed and delivered to manage interface between internal and external parties (esp. between contract scopes).

  • interface procedure

    CFIHOS-70000189

    A procedures around Interface management activities between internal and external parties.

  • interface register

    CFIHOS-70000190

    A register documenting agreements and responsibilities between internal and external parties (esp. between contract scopes).

  • interlock register

    CFIHOS-70000419

    A list of interlocks that automatically bring process to a safe state in response to specific initiating events.

  • invitation to tender

    CFIHOS-70000191

    A standardised document by which the Company invites Tenderers to submit a tender for a Contract. It encloses the conditions for the submission of a tender and gives the terms of reference or the technical qualifications required.

  • isolation philosophy

    CFIHOS-70000192

    A document outlining the premise and intent for isolation philosophy for safe plant operation and maintenance.

  • isometric diagram

    CFIHOS-70000193

    Construction detail diagram for 'piping and ducting', providing an accurate 'bill of materials' (BOM) / 'material take off' (MTO) and represented in a 3 dimensional isometric view.

  • key plan

    CFIHOS-70000196

    A plan view diagram of a plant/group of plants showing the interfaces of layout diagrams of components. Typically only shows major equipment and infrastructure to provide context and orientation.

  • layout diagram

    CFIHOS-70000277

    A diagram showing the precise location of assets/objects at a plant, process unit, or area basis relative to surrounding structures and equipment.

  • lessons learned report

    CFIHOS-70000197

    A report which documents lessons gained from the execution of the project.