Document Types

Document types used in this project.

  • test procedure

    CFIHOS-70000332

    A procedure to perform a test that equipment or systems are functioning and performing according to the specifications, function descriptions and operating instructions.

  • A time-based document outlining order in which tasks are to be carried out and the amounts of time allocated to them to achieve inspection and testing scope.

  • A document detailing the result from thermal expansion and informing design regarding the need for loops and expansion joints.

  • Calculations to demonstrate thermal ratings of heat exchangers.

  • A report documenting the review results from 3D review addressing steelwork structure, equipment envelopes, escape routes, building envelopes, envelopes for main piping, HVAC and cable rack runs, preliminary road layouts, etc.

  • three line diagram

    CFIHOS-70000410

    A diagram depicting each line (e.g., positive, negative, and ground on a DC System) describing an electrical system. Example: the connection of a pump its control station and the MCC.

  • tie-in list

    CFIHOS-70000337

    Tie-in list identifies areas of a brownfield facility where connections will be made. May include interfaces between project stages, contractors and systems (e.g. new to existing plant connections).

  • topographic map

    CFIHOS-70000338

    A diagram describing grade and elevation of a given area. Also for seafloor at offshore site and access route.

  • training manual

    CFIHOS-70000339

    A collection of training materials. May include 'operational & maintenance training plan' providing durations and locations of sessions.

  • A report documenting assumptions and method determining computer analysis to verify the module design for transportation condition.

  • trench diagram

    CFIHOS-70000342

    A diagram depicting civil earthworks for utility services (e.g., piping, cables) for construction activity management. Typically depicts slope, etc.

  • turnover plan

    CFIHOS-70000422

    A listing of data and documents to be handed over by the EPC to the owner/operator. Includes timing and formats.

  • A diagram showing the precise location of assets/objects at a plant, process unit, or area basis, describing elevation and relative to surrounding structures and equipment.

  • vibration analysis

    CFIHOS-70000351

    A report documenting assumptions and method determining computer analysis of cyclic loads due to vibratory equipment. (e.g. module and foundations for rotating equipment).

  • vibration report

    CFIHOS-70000352

    A report documenting vibration and displacement measurements of piping and equipment.

  • waiver request

    CFIHOS-70000353

    Request, approval or rejection for the relaxation of an element of the particular regulatory 'code', 'standard', 'rule' or 'regulation' where such element conflicts with the 'international code' or 'standard' proposed for the facilities.

  • waste management plan

    CFIHOS-70000354

    A document capturing what particular activities and requirements will be executed and delivered to support management and safe disposal of all waste.

  • weighing procedure

    CFIHOS-70000356

    A procedure to record weight during design and manufacture prior to shipment.

  • weight calculation

    CFIHOS-70000357

    Includes mass, buoyancy, and calculations used in the design of weight coating (eg. on submerged pipelines).

  • weight certificate

    CFIHOS-70000358

    A document certifying the correct gross weight for a piece of equipment including packing materials. This typically should also document the center of gravity.

  • weight report

    CFIHOS-70000359

    A report shows weight and center of gravity of equipment. If large items are to be handled for equipment installation or maintenance, then the weight and center of gravity of these individual parts should be shown.

  • weld map

    CFIHOS-70000360

    A drawing that usually identifies all welds and relates them to the relevant welding procedure number and non destructive testing requirements.

  • A document certifying a welder is qualified to perform work according to certain weld procedure.

  • A record documenting the execution and satisfactory testing of a weld procedure specification, typically includes all testing procedure references and both destructive and non-destructive testing results.

  • A specification that describes the welding procedure and process of a specific weld.