Document Types
Document types used in this project.
Document types used in this project.
CFIHOS-70000370
A document capturing what particular activities and requirements will be executed and delivered to manage simultaneous operations with a brownfield operating asset.
CFIHOS-70000371
A diagram depicting the main equipment items (switchboards, transformers etc.) and their relationships within the facility electrical distribution system including details of fault levels and current and voltage ratings.
CFIHOS-70000428
A document defining manufacturers recommended site tests for the equipment.
CFIHOS-70000430
Records demonstrating that the equipment has been tested according to the site acceptance test procedure.
CFIHOS-70000453
A study providing details of site data or information where work is proposed.
CFIHOS-70000372
An assessment which details the impact of facility on the surrounding community and infrastructure.
CFIHOS-70000373
Onshore and/or offshore investigation and survey reports and topographic data. Includes soil, rock, minerals and organic matter from soil investigations and surveys.
CFIHOS-70000374
A list of recommended listing of spares received from vendor/manufacturer to support installation, commissioning, operation or maintenance.
CFIHOS-70000454
A list of all special tools necessary for handling, dismantling, maintenance of equipment.
CFIHOS-70000375
A report to ensure pipeline stability under extreme environmental loading.
CFIHOS-70000426
A document describing required skill, knowledge, experience for a range of positions to execute the project. May address dates of requirement, quantities, etc. Includes job descriptions.
CFIHOS-70000376
A document capturing what particular activities and requirements will be executed and delivered to support effective communication with partners and external stakeholders.
CFIHOS-70000378
A calculation to determine how a pipe or piping system behaves based on its material, pressure, temperature, fluid and support.
CFIHOS-70000455
A list of sub-suppliers or sub-contractors providing processes, products or services to the supplier or contractor in conformance with owner requirements
CFIHOS-70000280
A document capturing what particular activities and requirements will be executed and delivered to manage subcontracts. Also used to track status of all the essential activities to be performed. It categorises the actions to be taken (e.g. team roles and responsibilities) and also the status of them (e.g. 'open', 'action party', 'due date').
CFIHOS-70000382
A detail diagram depicting the support of pipe, cable, instrument and other supports (e.g., pipe shoes, sleeper, hangers).
CFIHOS-70000384
A procedure detailing painting, coating and cathodic protection.
CFIHOS-70000386
A document capturing what particular activities and requirements will be executed and delivered to support a comprehensive development of the asset. This includes but is not limited to community affairs, local content issues, societal effects of project, local business development, etc.
CFIHOS-70000457
A diagram illustrating software system components and how they interact with each other.
CFIHOS-70000388
Includes load flows, transient and dynamic stability, short circuit, protection study, co-ordination and setting.
CFIHOS-70000389
A request, approval or rejection of changes to a technical specification. Would typically include justification and reasons for the request, and acceptance or rejection from a purely technical perspective.
CFIHOS-70000390
A communication documenting how an engineering or maintenance issue will be resolved and what the implication of the solution is.
CFIHOS-70000392
A document capturing the results of a technical and/or commercial evaluation of tender based on pre-defined criteria and/or conditioning for purposes of selection and award.
CFIHOS-70000330
A diagram for equipment, panels, junction boxes, etc. identifies all connections and cable terminations at input/output rails. Required for removal/hook up purposes and modifications. To include vendor interfaces.
CFIHOS-70000331
A document capturing scope and details of the activity to which it refers and any conditions relating to the appointment of a person(s) to undertake the activity. Includes the distribution of work, schedule and the responsibilities among the people participating in an evaluation process.