Document Types
Document types used in this project.
Document types used in this project.
CFIHOS-70000037
A consolidated study reviewing critical equipment and recommending capital spares.
CFIHOS-70000039
A diagram showing locations of cathodic protection and schematic diagrams.
CFIHOS-70000409
A diagram that is showing the causes and consequences of different errors, especially related to failures in the control system.
CFIHOS-70000042
A procedure describing how changes through 'design', 'construction' and 'commissioning' will be managed.
CFIHOS-70000043
A consolidated register of proposed and/or processed change associated with all change to originally agreed design scope/statement of requirements, including basis for design.
CFIHOS-70000044
An advance notice to another party, e.g. another design department or fabrication facility, that there is going to be a change to a document that has been issued for construction.
CFIHOS-70000347
A notification formally incorporating the change issued against existing 'contracts', 'agreements' and/or 'purchase orders' based on a change request.
CFIHOS-70000395
A document which captures a recommended course of action with justifications from technical and/or commercial aspects to execute an activity to change something. May lead to a change request.
CFIHOS-70000349
A request, approval or rejection of changes to an existing contract. Would typically include justification and reasons for the request, and acceptance or rejection from a commercial or contractual perspective, but may also contain some technical content. For similar documents pertaining specifically to technical deviations, with no commercial/contractual content, refer to 'technical deviation request'. May be triggered by a change proposal.
CFIHOS-70000417
A collection of specific activities to test completeness of installation or energization of a specific equipment class. Includes collection of specific data based on testing parameters.
CFIHOS-70000072
Detailed report from results of corrosion inhibition, hydrates, flow assurance, etc testing plan. Includes any preliminary testing required to establish parameters for testing.
CFIHOS-70000074
A document capturing parameters and requirements to validate selection of chemicals including but not limited to corrosion inhibitors, hydrate inhibitors, and flow assurance chemicals.
CFIHOS-70000045
Request (e.g., from a Contractor) for clarification of scope, technical details, or assumptions.
CFIHOS-70000048
A document outlining purpose and approach for commissioning and start-up.
CFIHOS-70000051
A cross-discipline, internal and external communication procedure, responsibilities, and governance.
CFIHOS-70000414
A document certifying a scope or project activity has been successfully completed and tested for functionality.
CFIHOS-70000055
A diagram showing details of cable numbers and terminations point to point (e.g., to/from vendor packages, equipment).
CFIHOS-70000420
A consolidated spare parts list generated to support execution of project purchasing for the purpose of commissioning, start-up, maintenance support, etc.
CFIHOS-70000062
A document assessing sequence and method of construction of a facility to determine the best way to proceed.
CFIHOS-70000057
A diagram detailing assembly and fabrication.
CFIHOS-70000060
A time-based document outlining sequence and duration of activities related to the completion of construction scope. Construction includes site erection and assembly but not fabrication at third party sites.
CFIHOS-70000063
A binding document which records a agreement and its related mutual obligations and commitments. Typically having effect on a project or the future life of a facility. For example a sales contract, maintenance contract, etc.
CFIHOS-70000064
A document outlining the premise and intent for start-up and shutdown for process control. May also list instrument and control equipment, pre-alarm and shutdown alarm/trip requirements, failure modes of valves and equipment and type of signals to and from the control logic. Basis to develop more detailed control narrative.
CFIHOS-70000066
A pictorial representation of the main elements and functions of a control circuit/system with input/output sources (switches, relays etc.) and their relationships. Details logic functions of the circuit/system. I/O loading and cabinet layouts.
CFIHOS-70000070
A report detailing actions to be taken to improve a process resulting from an 'audit' or 'quality assessment'.